Do-it-yourself frame booth: Pokrokova instructions for choosing from a photo. Drіbnozaglybleni strіchkovy foundation

Our Pokrokov instructions we divided the life of the frame booth into sprat stages:

Varto indicates that the leather stage of the life of a frame booth is meritorious for a great statute, for an addition to everything, to describe everything possible options foundations, dakhiv, etc., the whole book can be found. At the link with the cym, to improve readability, the activities of everyday life are reportedly described in a few articles, and here there are less of those that stand for the peculiarities of themselves frame booth.

Krok No. 1: Preparation of robots for the life of a frame booth

Preparatory work for everyday life, whether it be a house, however, and include:

  1. Preparing a business
  2. Rozmіtka booth

Preparing a business

For the cob, it is necessary to clear the vineyard from the overgrowth, even if not all of it, then if you want those places, where there will be houses. It is important to lighten the layout and allow more precise.

If the life of a village can be great, then, depending on the type of foundation, that bajannya, you can backtrack along the horizon, vikoristovuyuchi special equipment.

Respect! Do not be fooled by this procedure, having spent 1-2 years for cleansing, at the future you will significantly ease your own work, that and die by the grass can be with a great loss.

Razmіka booth

Rozmіtka is an even more important stage, so that it is necessary to lay down the planning and evenness of the walls. In case of inaccurate rozmittsi at the next stages, it will be more difficult to correct this pardon.

Marking the foundation of a frame booth, like, vtim, and be-anything else, as a rule, includes the front placement of the bells (all the calling walls are marked), as well as the marking of all the internal walls.

If you want to find out how to correctly mark the foundation for the houses with your own hands, so that all the walls and kuti were equal to the project - please read my article about it. Looking back at the great collection of information, I had a chance to blame it all.

Krok No. 2: Do-it-yourself foundation for a frame booth

The majestic advantage of the frame booth is that for the yoga of life, there is any type of foundation. The only exchange is the type of soil on the premises and your capacity.

Varto say that laying the foundation for a frame booth with your own hands was merited on the borders of those discussed and blamed on the borders of the state. Tim is more, what types of suitable foundations are in the kilka, and which one to choose - only to you.

Here I will tell you two words about suitable foundations for a frame booth, and about those, in some sorts of stasis of skin from them, and also I will give a request for descriptions of their reports.

The widest type of foundation for a frame booth is coat-guinted. This is the most practical and found option for such a booth, moreover, it is not difficult to install the installation of a screw foundation with your own hands.

Such a foundation is practical for any kind of soil, krіm skelesta. It is especially good to go for swampy soils, where deep soils grow deep and other types of majestic vitrates.

Vzagali, all the pluses and minuses of the pale-gwint foundations are considered in other topics, as to help you choose the support for your booth.

Drіbnozaglybleni strіchkovy foundation

Dribnozaglybleny strіchkovy foundation, so vikoristovuєtsya for everyday life dosit often. This is tied with small windows on the foundation, and it is also possible to use concrete pidlog in the booth.

Such a foundation has a connection with the yogo permeable krykhkistyu, which means the exact pre-trial technology of embedding.

As a rule, deep soiling of the line foundation is victorious in good soils, and there are categorically contraindications on soil with a high level. ground water and swampy soils.

Slab foundation for a frame booth

In the rest of the hour, more and more popular for the life of a frame booth with your own hands is gaining a slab foundation. Not marveling at this a lot of versatility, the new one has obvious pluses, such as universality, supremacy, longevity, and you can also win like a black pidlog in a booth and not stain yourself on a new okremo.

Often, instead of a classic monolithic slab, a vicorous slab foundation with stiffener ribs is used. Tse allows you to protect the troch on the mortgage, and also strengthen the entire structure with a burn.

Krok No. 3: Do-it-yourself installation of a frame booth

The logs in the frame booth are not very easy to fit into the logs of other types of booths and can be wooden or concrete. Vybіr povnіstyu lie down according to the type of foundation, the possibilities of that bazhannya.

In this covert instruction, we can only look at the wooden pidlog, the concrete one - in two words, so it’s easier to win, and it’s not possible to fit everything in one article.

Welding of concrete underlays

the concrete underlay in the frame booth is vlashtovuєtsya, at the slopes of the slab foundation, or the strіchkovy. From the slab, everything was understood - the slab itself will be the first one on top.

And the axis of the slope, like a strichkovy foundation - concrete underlay is built from light concrete, such as expanded clay concrete, for example.

Vlastuvannya derev'yanoї pіdlogi

Let's take a look at the installation of wooden plinths on the butt of the coat and screw foundation. For a stringer, in principle, everything fights on its own, for a little bit of lower strapping, you can use more thin timber. Ale about everything in order.

Tying the foundation of a frame booth

The vlastuvannya derev'yanoї pіdlogi starts from binding to the foundation. As a rule, the binding is made of timber 150x150 or 150x200, fallow between the walls and between the fires. Than more vodstan, tim comrades may buti timber, sob sagging sag.

The strapping is necessary, firstly, in order to give the foundation hardness, in another way - for the equal distribution of tension on the foundation, that and thirdly - it will be a support for the future footing of the frame booth.

In order to easily create the process of tying with your own hands, let's divide it into a sprat of stages:

  1. The beam is laid out along the perimeter of the foundation, the dozhina walls and diagonals are re-wired. At this stage, a residual and accurate layout of the walls is carried out according to the project. Before speech, do not forget about waterproofing, as if looking at roofing material, we put a bandage.
  2. The advancing crock - we are going to miss the beam, the stench is to blame, but roztashovanny on the fire, so it will be the weakest place, as if not guilty of hanging. It’s worth the cost of budinkiv, the dozhina of the walls of some more for the dozhina of the railings.
  3. The beam is stuck with an overlap of 20-30 cm, as shown in the photo. For whom from the butt end are so called "castles".
  4. Kuti sticks practically the same way. It is clearly visible in the photo.
  5. The timber to the foundation is fastened for additional bolts or studs. For which it is necessary to drill, open it both in the head of the foundation, and in the beam itself. For the convenience of further installation, the parts that are being screwed up - the heads of the bolts or the nuts with the studs, must be buried. The sticks are additionally penetrated by flowers with a diameter of 150 mm or 200 mm fallow in the opening of the timber.
  6. Well, the perimeter is ready, we move on to the final cut - tying the foundation under the inner walls of the frame booth. The whole beam, up to the already installed sound, creaks just like that. For strength, you can additionally zastosuvat kripilnі metal kutochki.

If you are ready to tie the frame booth to the foundation, we proceed to the next stage of our instructions - the installation of a base for the frame.

Frame pіdloga in booth

Varto designate that already at this stage it is necessary to transfer all communications that enter the booth, such as water and sewerage. Electricity and gas can be supplied and then we will, but if it’s farther away, everything will be done - there will be less problems later.

With the coming crock, a lag will be installed, on top of the binding. If you want to stand between supports close to 4 meters, it’s better to vikorate a beam with a size of 100x200mm or 100x150mm. You can beat a board 50x200mm or 50x150mm, sewing them in two.

Even if you are less than 3 meters, you can beat a board with a size of 50x150mm or shorter than 50x200mm.

Installation of the lag is a clumsy stage of choosing a frame booth, but there are some nuances, as in this instruction it is necessary to transfer:


Do-it-yourself waterproofing and insulation of a frame booth


Varto designate that waterproofing, like and vapor barrier, should be installed with a lap, zgіdno z іnstruktsієyu to the material, including when water gets into the insulation, like zvnі, so in the middle. And the heat insulator itself is laid in a slot, without slots.

Axes mi and looked at the instructions for the installation of the frame booth, now the time has come to proceed to the walls.

Krok No. 4: Laying the walls of a frame booth

Let's step on our rock instructions Bude installation of walls with your own hands. So, as a matter of course, creaking all the boards and beams will be flowers and (or) mounting metal coils, which can be fastened with hairpins.

Almost the entire frame is assembled from boards with a size of 50x150mm or 50x200mm, fallow in the necessary comrades of the wall and the necessary comrades of the insulation.

It’s important to know that it’s better to install a beam along the corners of a frame booth, but we don’t know it right, but why - a little less, in the installation process, I’ll tell you about everything.

Also, it’s better to choose the frame of the walls of the future booth.

For a brief understanding, we will divide our instruction into the walls of a frame booth and divide it into a few steps:

  1. Folding the walls of a frame booth. Vіkna that door
  2. Installing and fixing the walls vertically on the rails

Folding the walls of a frame booth with your own hands. Vіkna that door

Walls are chosen on a ready-made frame booth, the best option. Ale, you need to lie, what is necessary in this moment, so that the measurements were accurate, so that the stanzas did not come out as short as they already were.

In order to be aware of what I'm talking about, start wondering at wall of a frame booth in a rose , And then I'll tell you about everything in order.

Now let's take a pokrokovo, how to pick up all the walls of the frame booth with your own hands:

  1. Nasampered, we need to be assigned to the height of the stele in the booth. It is assumed that the height of the black stele will be 280 cm. Mean vertical posts of frame walls can be 280-15 = 265cm. The scheme shows that the stars took 15 divs.
  2. Vіdstan mіzh stіykami, as a rule, are chosen from the width of the sheet of insulation, as a rule, its width is 60 cm.
  3. The upper and lower boards of the wall are laid out on the underside and rozmіchuyutsya mіstsya, where vertical struts are nailed. Then we lay out the stands themselves and break through with flowers 120-150mm. You can dodatkovo skripit їх kutochami.
  4. The skin wall will be smaller than the tovshchina of the wall, lower dozhina pіdlogi. You can see it better on the diagram.
  5. If the dovzhina of the wall is bigger for the dovzhina of the doshka, then the wall is collected from dekilkoh parts. So it’s worth it to fight in quiet moods, if there are few helpers, to that the wall was chosen by the mother of great vag.
  6. As a rule, jumpers are mounted between the studs to increase the strength of all constructions. There are no hard rules for quantity and frequency of installation; Another option is shorter and can be seen in the photo, if you break through one at a time - the stench is mounted in a check order (one is below, stepping on the mountains). We can work and sweat, if the walls are installed. Most of the jumpers break through with a rosewood, so they will serve as a stick of plywood or osb-plates, fallow from distant robots.
  7. Open the windows and doors in the wall of the frame booth to swing as shown in the diagram.
  8. The axis looks so “live”.

The widest pardon, when the walls of the frame house are folded, are those that many people forget to vrakhovuvat the house of the house during the roses, while the wall itself does not come out like that, as you would like to.

Installation of walls on the floor


Warto means that when the walls are folded, it is necessary to twist the cord, pulling it from one kuta to another, otherwise, the kuti will be equal, and the walls - nі.

Upper strapping and reinforced construction

Later, the frame of the walls of the walls, now it is necessary to build the upper strapping from such a board itself, like a wall.

The upper banding is necessary for the small joint of the kutivs, and also to give uniformity to all parts of the frame walls and to separate the gap between them.

For this, it is necessary to pierce the board with 120-150 mm flowers over the walls, along the entire perimeter, including the internal bearings, so that all the sticks are overlapped with a minimum overlap of 25-30 cm.

The next stage of our instruction will be the strengthening of all constructions with a flame. There are a few options, the most wide-ranging ones are stronger for additional plywood and OSB-plates.

As a rule, having broken one side along the entire perimeter (internal or external) with sheets of OSB-plate, the frame of the booth already becomes hard.

Internal partitions of a frame booth

Attachments of the internal partitions may not be blown away by the vlastuvannya of the outer walls, due to the fact that before them there are more m'yaki and the goodness of that insulation.

  1. Internal partitions, on the vіdmіnu zvnіshnіkh walls, can be worked by the lesser tovshchina. Here everything will lie down for the comfort of soundproofing.
  2. Heat-insulating, middle partitions, will be, in the first black, sound-proofing material, lower heat-insulation.
  3. Internal partitions are allowed to be insulated without waterproofing and vapor barrier materials.

Tse all the main vіdmіnnostі vіdmіnnosti vіdmіnіh vіd vіd vіd zvnіshnіh, in іnshoy the stench vlashtovuetsya so itself.

Krok No. 5: Dah frame booth

The frames of the frame booth are practically not visible in any way in the dahu for other booths, which are concrete, and which look like other ones. I’ll tell you more, the installation of a dash for a frame booth will be less laborious, lower, for example, for a block or a block, so that it will be much easier to fix it to the walls.

Budіvnitstvo dahu - the process is more complicated, but if you don’t have a better plan for the house, then you can easily build it with your own hands.

Pobudova dahu be some kind of booth, in that number of the frame - the theme is already great, de є impersonal nuances. First of all, it is impossible to describe everything in a single article. Well, in a different way, so as not to confuse you, I, perhaps, will transfer this topic to a perfect article.

Krok No. 6: Insulation of a frame booth

Axis mi i climbed to the final stage of the life of a frame booth - yoga insulation. It is necessary to insulate everything - a bed, a wall, that stele.

You can read more details about the insulation of a frame booth with your own hands in the next detailed instructions, here we will discuss only critical moments.

Choosing an insulator for the walls of a frame booth, it is necessary to protect not only the characteristics of the insulator itself, but also the features of the tree, with which not all see the insulator is good to interact.

The axis is small instructions for insulating a frame booth with your own hands:

  1. Zovni, on top of OSB sheets, a special waterproofing membrane is stretched. Which side can be in the instructions before it.
  2. In the middle of the booth, between the stіyok, the insulation is laid, at the sprat balls, fallowly, from the booth to the booth and the comrade's wall. The leather ball is placed with an overlap on the stick in front, so as to escape the cold.
  3. The insulation of the underlays is carried out just like that.
  4. It is better to insulate the stele from the hillside, stuffing the vapor barrier from the bottom on the stele beams and lining them with a board or plywood.
  5. After laying the insulation, it is necessary to fill the vapor barrier on top of the new one, it is necessary to cover the insulation in the middle.
  6. Fallow for the needs of distant processing robots, sheathing material is stuffed on top of the plait on the wall - an abo reyka board, and most often - OSB sheets, on top of which, in the near future, a clean renovation is carried out.

Yak Vee was already beaten up, the text was already too rich. Ale, I respect, here all the stages of everyday life are reportedly described do-it-yourself frame booth regardless of those who were guilty of moments among those around them, but only for your good fortune.

I am relying on those who, following the given cover instructions, You can, without special efforts and with minimal windshields, arrive at a warm, quiet and desolate booth.

We suggest to you frame booths for independent storage. Having been honored on independent folding, You are guilty of remembrance, that a less literate pidkhid before any operation during installation guarantees a high quality and a long life.

In our option, we consider the installation of structures on a ready-made foundation slab. This type of foundation is the widest, because there are a number of sources of advantages (the availability of beams for overlapping the basement with basalt insulation, the possibility of installing a water heating system, attached engineering wiring, etc.).

Before the cob installation neobhіdno perevіriti visotnі that geometrichnі rozmіri foundation, SSMSC povinnі vіdpovіdati budіvelnim standards (dopuskayutsya mіstsevі vіdhilennya verhnoї poverhnі foundation pid hour perevіrki Reiki 2m from the furrows of 2mm and dopustimі vіdhilennya od vertikalі abo od project Nakheel ploschin the entire visota fundamentіv stanovlyat 20mm).

Required tools and accessories for installation

  1. Perforator with drill Ø12mm x 250mm;
  2. Screwdriver;
  3. Electric drill;
  4. Electric planer;
  5. Bulgarian
  6. Impact wrench for screwing capercaillie with head 13mm;
  7. A set of socket heads from a comir;
  8. Knife;
  9. Electric file;
  10. Clamps 4 pcs.;
  11. Down drill Ø30mm.

Vymogi before saving, installation and operation of wooden structures

  1. Avoid contact with water and other chemical reagents. Protect on pads lifted above the ground and cover with panels of waterproof material with water runoff. When saving the lining, it is necessary to lay sheets of polyethylene.
  2. Do not allow mechanical failures, do not throw.
  3. Structural changes are not allowed.
  4. Installation is carried out according to the installation plan.
  5. The replacement of structural elements with similar elements of other manufacturers is reserved.
  6. It is not allowed to replace the cover material, which was booked with the contract, for any other material.

1. Mauerlat - this is the supporting board, on which all the frame walls are mounted 1 on top, to which the part of the work is important, which requires special respect. Minimum usunennia, and your walls will not stikvatimutsya.

Designate, for the sake of the project, the entire layout of the Mauerlat. Reverse the diagonal zgidno with the plan (obov'yazkovo metal line). On the concrete under the Mauerlat, lay the str_chkovu hydro-insulation (roofing material). Fastening the Mauerlat to concrete with anchors Ø10x120mm from a washer. In front of the mauerlat in the area of ​​​​stringing with an anchor, choose a feather drill about 10 mm in order to make the anchor level. Croc fastening 500-1000 mm.

After the residual installation of the Mauerlat, attach an extension made of linen and jute fabric to the beast. Narize the canvas with a width of 145mm and fasten it behind the help of a furniture stapler (staple 8-10mm).

Assembly plan of panels 1 on top


2. The folding of wall panels starts from the hut of life. Having installed one panel and fastened it to the mauerlat with “capercaillie” M8x80 at a checkered order with a crochet of about 300m, install a timchasovy pidkіs. The constructions do not require the front laying of the insulation at the end of the panel before installation.

Having reviewed the marking of the panel from the project documentation, install the next element of the wall. Panels between themselves are creaked with capercaillie M8x90 with reinforced washers, pulled together with clamps in front. In places with stronger structures, “capercaillie” M8x160 and M8x200 are needed. For the stability of the outer walls and the accuracy of folding, one-hour installation of the inner walls is recommended.

3. On top of the wall panels, lay a lion-and-jute chink and fasten it with a stapler, and then install a board tied to the wall. Fastening with "capercaillie" M8x80mm with a crochet of 300mm at the check order.

Mounting plan of beams overlapping 1 on top


4. It is also important to finish all the expansions and install the beams from the markings on the beams. Overlapping beams are fastened up to the boards of binding panels 1 on top with KUU-70 gussets on both sides with 4x50mm screws.

After the installation of the beams, they should be tied with a cut with a bar 45x90mm along the contour (along the grooves on the edges of the beams) and additionally in the middle of the beams. Fasten with screws 5x90mm. Install sockets 2-R1 under inner panel 2 on top of 2-IN. Creep with KUU-50. To give respect, the overlapping beams are located exactly on the st_ykah of wall panels. If so, then do everything right.

On the beams of the overlap, lay a black lining from OSB-3 plates with a torso of 22 mm.

Mounting plan of panels 2 on top


5. On top of the black lining, install the bottom strapping of the wall panels 2 on top, laying in front of it a thickening made of linen and jute fabric.

6. The folding of panels 2 on top is similar to the folding of panels 1 on top (div. item 2).

7. Binding of zrobiti to the beast of wall panels along the contour (div. p. 3).


8. Mount the F1 carrier beam before us. Fasten to the walls behind the additional cutters KUU-105 with 4x50mm screws. Beam, that fermi dahu, and go to the vag, which allows you to do without vantazhopidyomnoy technique. After the installation of the F1 beam, we install the supporting trusses SN1 and NU6, and then we fix all the trusses.

Krokvyanі truss, to come to load-bearing trusses (F1, SN1, and NU6) under the welcome hood, creep for additional betting kutochkіv VV L and BB P. Crokvillnі truss, to come to carry trusses under a direct kut, creep for additional brackets O7 R50 OB L i OV P. Krokvyanі fermi krіpit until tying the wall panels with KUU-105 coils.

In the case of a single truss, there are pairs of blocks "A" and "B" between them and the right of the part of the trusses, which are right-handed and left-handed in the bearing beam F1. Fasten with M12 bolts, washers and M12 nuts. Fermi, get down to the pediments, creak with one “A” block and two “B” blocks.

Gables go down L-NU to fasten to walls 2-EX and end trusses with screws 5x90mm.

Fermi Dahu creak behind the help of internal connections 45x90mm with screws 5x90mm.

Sheathe the walls, not the sheathed beams of the ceiling, the wall panels and the fermi-dahu OSB3 9mm.



Nareshti took off her copy of Budinka Mriya DeAgostin! Checks for parcels in DeAgostin had a chance DOVGO - three months from the moment the sheet was edited with pasted coupons. Months later, after a second, they wrote to them a sheet of requests, which was accepted, and which, they didn’t stink. I didn’t even check, and a text message came in rapt, and after a few days, I was already leaning on the mail. So scho zamovlennya stinks all the same, they just accept checks for a long time.

A box with a budinochka - that cuff is too big (about 9 kg). All wrapped up in tape, but as a yogo cut apart, the beast can handle the box, so carry it handily. Box with inscriptions - Dim Mrii (different language). So they have their own boxes.

Dim More rich, lower I ochіkuval. Zrobleniy yakіsno, the most worthy was the improvement in the middle of the hut - everything is textured, accepting tickets, the masters in this hut are clearly savoring the garniest relish.

I bathed yoga not for myself, but as a variant of a child's playing house. For 3000 (for coupons) - it's just a gift. You can buy whole yoga for 5-6 thousand rubles ( є in ozone) - it’s even more inexpensive for such a booth, I didn’t know youma analogs in the middle of the game (accepted from Russia, just like only in America). So take it, do not hesitate - the booths of that warty. I thought it was expensive, I didn’t get it, now I understand that the price in the new one is simply miraculous! Find the same store price.

I choose the Dim Dream series itself by choice, so I don’t have everything that happened. Ale bagatto іnshoy lyalkovoi miniature - like Melisi, etc. Dechogo is clearly not available (for example, baths) - I’ll buy it in Ozon (tse 5th number - don’t start in the presence). The tables are not already hanging, and I will call them the tables. Hotila 14 (double style), 17 (fireplace), 18 rooms (armchair-goydal). I deyakі іnshі. Now, if there are houses, it is easier to understand what is necessary for obov'yazkovo, and what you can skip.

Great booth. A mature man is not to the waist, a troch is lower, but close to that, children of seven fates - on the chest and more. The room is big, and the world is more comfortable, to be able to grow and to be set up is a great joy.

Vіkontsі - pіd plastic "sklom". Only the sound is embossed. From the sides - embossed chain.

The details of the booth in the box are rich, but it’s easy to pick up, foldable vinickles in two places, easy to sort out (the door is one door with a prace of uvіyshov, and the rear invoice bar with a whole animal was more than half a centimeter away, I just pierced it with scissors, I can’t see it, before that well, it’s back, and the flake was not inserted in front of the door, I cleaned it with scissors - then the flake was slaughtered).

With significant expansion, the booths are not bulky, they take up little space, so it will be fine in a small apartment.

Doors-windows do not open, the facade of the booth opens.

Sim'yanok for a budinochka I had more and less enough - і portselyanova, і three splendid ones, also rich bagats. :-) Guts and dogs are immediately needed in Gulliver Collecta - it’s a miracle to sit on the end (pictured above) .

Houses dosit mіtsny, scho marvelous, vrahovoyuchi, scho zbiraetsya without screws and glue. True, all the same, not such a mіtsny i shіlny, like Playmobil.

Zagalom, I’m glad, I recommend it to everyone, you don’t choose to visit Dim Mri, as a childish playful version of a house of wines, perhaps, Russia has the best today. You can bathe the girls at the beginning of three years - you can live with Playmobil, and Sylvanian Families, and whoever.

At the photo gallery below, I publish also the necessary reversals of the instructions for choosing - you will get to the bottom of the house.

Budinok Mrії - selection, frame of a booth

A box of Budinka Mrії - in such a package of possible budinok from the post comes. :-)


Details of a booth.


Details of the booth - with windows.

At the vіkontsіv є plіvka - slope.


The vіkna relief is even more beautiful.


Maybutnya pіdlog one of the tops of the budinochka.


The future walls of the dream house.


Attic windows - right attic windows, with ledges.


We begin to pick up the booths: to the lower part we set the middle and the extreme. So far it's smart.


At the groove, the back walls are inserted. Already mіtsnіshe, but still cunningly.


Zasuvaemo pіdlogu attic. Now the design is to finish with a steady.


View from the side - here the pidlog in the groove can be fixed.


Podloga of the future attic.


Two details are inserted between the lower and upper pads - the pads of the other on top. For me, the detail of the underlay of the other on top (vitalnya) was torn up, more on the mail, often the details were beaten out of the box, they were not far away. Ale, everything began with a kilim. Be careful, details fray!

Instruction from the budinochkom Krosh from the Land of Smishariki. :-)

The axis here pierced the bar with a whole with scissors;


Close the attic.

Closing the house and opening the attic - the doors are broken in the distance, they are kindly trimmed, do not fall on their heads. :-))


Pronunciation of the houses.


Ready BUDINOK MRІЇ - zіbrany, with open doors.


Open the chairs far away to fill the space in front of the house - the houses are better to go out of the courtyard, and it is light through the windows ... beauty! :-)


The other side of the house is the kitchen and the bathroom of the room.


Mansard of Budinka Mriya.


Dira for future gatherings (well, it’s not possible to put it in a row with a dude???).


The first and the other over Budinka Mrії.

It's bright in the morning... like at a right booth! :-)

Zibraniy DIM MRII DeAgostini.

Now naytsіkavіshe - furnish !! :-)


Lizhechko chervonnogo tree vіd Melisi.


The child of the room near Budinka Mriya.


The soldier from the Napoleonic Wars at Budinka Mriya is small.


Portrayal boy.


Mom for a dressing table (porcelain).


Girl on the sofa (porcelain).


Servant in the kitchen (porcelain).


Didus (Lalkova Porcelain Homeland).


Grandmother on the sofa with Melisya (porcelain).


Koliska Reuters Porcelain tezh at the child's vіdmіnno placed.


Lyalkova family from Melisya.


I have two such baby dolls Simba, on the site about them.


Mother of Sim's baby dolls Simba.

A bunch of Gulliver Collecta on the side of Budinka Mriya.


It's wonderful to sit on the podiums. :-) Dog tezh vіd Gulliver Collecta.

Lyalkovy tato marvel at the end.

Kіshka on a whim.

INSTRUCTIONS FOR SHOWING THE BUDINKA MRII - go in a box with a booth. Let me publish it again.

Description of all details of the booth.

Details of the dream booth.

Folding the house of the dream - the cob (bottom, back, back walls).

Sublog-overwriting of surfaces.

Doors - the facade of the booth, that attic on top.

Attic door.

Zvorotny bіk іnstruktsії - ready BUDINOK MRІЇ.

  • Budynok Mrії 42
  • Budinka frame for Budinku Mriya
  • Brazilian version of Dim Mriya
  • Dream of De Agostin
  • Budinok Mrії 45
  • Budynok Mrії 44
  • Dim Mrii 24 - sofa
  • Dim Mrії 17 (fireplace)
  • Dim Mrii 23 - plate
  • Dim Mrії 22 - pianola
  • Dіm Mrії 55 - go and set the table
  • Dim Mrii 12
  • Budynok Mrії 37
  • Budinok Mrії 38
  • Dim Mrii 26 - kitchen sink
  • Budynok Mrії 5

    Quiet, hto bend tsіkavіshe roztashovuvati in the interior; but if the players don’t bathe them better, they will call out (reversed: - (()).
    From fіrankami in the attic bіda - uphill with your feet, really. There, as if only blinds were like sporudzhuvati, they were creaking on windows, even if it was possible. Ale tse zovsіm jewelry robot.

    Did you pay how much for shipping?

    As if I don’t have mercy, the DeAgostin’s rate for the parcel is one and the same (independently, depending on the amount of the administration of the same amount): 50 rubles. You can say it flawlessly.

    Vzagali in Ukraine such a house for more low 1 cost is close to 350 dollars, so you buy all the tickets and the house is naturally with coupons. Singing like that, grandmothers can sing alone. I'll be more happy, I can't allow the shards to buy their own one issue of the magazine.

    Tatianno, I don’t have all the numbers, I’m far from sleeping all of them, but I’m publishing.

    I imagine everything is suffocating your children, I myself didn’t buy anything from this series

    Oh, and I’m not checking, I’ve been checking for 4 months already. :-(

    Uraaaaaaaa! Dim come!

    Tell me, be kind, but what about the house for the Sylvanian Families? The wine is built so majestic... why don't the little animal and its poor furniture be ruined by the walls of that booth?
    How can you show, be kind, a photo of Silvanchiks and their furniture in such a house, I will be more than happy!

In our country until recently, booths were built more importantly from logs from logs, ground or concrete, proteo infections, the hour of new technologies arrived, and framed booths appeared in this segment. The stench is even more popular for a unique high-quality investment and small financial investments. Ale smut - the ability to build a do-it-yourself frame booth with your own hands without stopping special equipment. Therefore, we have prepared for you a detailed instruction manual.

The core itself is made up of 7 stages:

  • choose a place for the house;
  • design;
  • foundation installation;
  • choosing a frame;
  • building walls;
  • thermal insulation;
  • cover work.

The life of a frame booth can be overwhelmed by other technologies - quick pace of life without irradiation to the work of special lifting mechanisms. Inexpensive carcasses are put into operation in one season, but such speed does not worsen the comfort and quality of living at any given time - these parameters are not higher, lower in wood and stone houses.

Choose a place at the dealership

Vіdpovіdno up to local norms of the Russian Federation, your living budinok is guilty of staying at least 3 m from the official cordon of the car. Also zdebіlshkogo mіstsevimi norms are regulated by 5-meter access from the Chervonoy linіnії ulitsa to the booth.

It should be noted that all skeletons are considered to be up to the IV and V degrees of fire resistance, it is obvious that you should be at least 10 meters up to the opposite norms in your wake.

Other ways to place a booth are presented in this image:

We are building a project

Apparently, before the Federal Law, the goiter forgetfulness is covered by a project created by professional organizations for the design. The documentation is also stored, but it can be approved by the upgraded landlords of various services, where they can make changes and/or additions.

Behind the fact, Mistceva Vlada seemed to be less obvious than a sketchy project, which included a scheme for the general plan, plans, plans, facades, and the main technical and economic displays. The cost of such a project is no more than 10,000 rubles, and it can be done after the fact that the building is put into operation.

Tim is not less, for your profitability and savings on re-engineering, we recommend choosing a different standard project, or putting together an individual design for special features like that favor. In that case, it is necessary to complete the layout of all communications and bring it to the engineering system plan.


An example of a typical sketch project

We appreciate your respect that typical projects are traditionally cheaper, and individual ones allow you to implement your own ideas. Individual armchairs from project documentation are formed with improved binding to the relief and other features of the house - only such a restraint can guarantee long-term operation of the dwelling without problems and major repairs.

engineering systems

In order to build a frame booth, it is necessary to transfer all engineering measures to the project. The stench is laid in strict sequence, and it is necessary to start from the foundation. At the time of blocking the concrete base, the technological openings of the communication systems need to be opened at the time of pouring, so that after being caught, the collapsible openings are not engaged.

The electrical system consists of a switchboard, electrical wiring, sockets and grounding. Vіdstan between points pіd sockets can become more than 4 m. Ventilation system includes air vents. Chi varto guess, what kind of proper pipes and wires to lay the foundation for access and coring with cranes, vimics, as well as the functioning of drains and sewers?

Foundation installation

The technology of everyday life transfers zastosuvannya or. Mitsnist bases move for additional fittings and monolithic strapping. It is possible to build a good foundation only after a geological analysis of the soil has been carried out.

For the most vipadkіv for a frame booth, it's a simple base to finish, as it's easy to show off the small vanity. Naydorechnishiy -. Such a foundation does not mean a large amount of materials, which makes everyday life cheaper by 15-20%.


At the time of a monolithic foundation, it is necessary to make a trench, deepen the soil and sip a pillow. Before that, how to start pouring concrete, it is necessary to make the formwork and install the reinforcement. Rozchin at the process of pouring obov'yazkovo rammed. In a rare concrete base, install vertical studs with a length of pvmeter through the skin 2 m - the lower strapping of the frame will be attached to them. On top of the grillage, scho viyshov, obov'yazkovo virіvnyuyut cement rosemary.

Lower harness

After seven days, after the concrete work is done, a bottom band of wooden beams with a span of 15x15 cm is laid on the entire surface of the foundation.

The beam can be fixed with anchor bolts and foundation studs. Likewise, bolts are twisted, under them it is necessary to drill technologically open up to 10 cm into the depth.


Sublogs

If all wooden beams are laid and tied one to one with the foundation, they form grooves and spaced logs (dosk 50x150 mm). The upper part of the lag is twisted horizontally, and the boards are nailed along the bottom - the stench will be the basis for the power of the black pidlog. Membrane insulation is laid on the plank base (it does not allow winding and wetting of the insulation, while not changing the name of the water vapor). At the floor between the lags, it is necessary to press insulating material (mineral wool or polystyrene) and cover the vapor barrier. On top is a board of cut (40x15 mm).


Created frame

From the very name of the technology, it was understood that the main element of such a dispute is the frame, and the whole structure is reduced to the new. The skeleton is made up of vertical posts, fixed behind additional crossbars and horizontal strapping. Like before, here the whole everyday process is completed step by step.

As a material, wood is stagnant. It is recommended to choose coniferous timber from the small world of moisture, ideally - chamber drying. According to the height of the stance, the blame is based on the same parameter of the application. The staves are hung with flowers with a length of 10 cm.

In addition, it is necessary to take advantage of the fact that it is navantazhennya vplivatime on bearing supports, as well as those who are looking for insulation and sheathing material are planned to be installed between stiykas. The universal cut of the posts is 150x50 mm, at the cuts, put a double beam of 150x50 mm. The most popular crochet - 600 mm (allows you to install an insulator at the tension for a slotted wall covering). For the purpose of closing the stilts with the lower bandage, stagnate the time of the hours, through which the spore fills the necessary hardness.


Scheme of vlashtuvannya kutіv sіn

The installation of the upper piping is installed after the installation of all risers. Fixation is needed for the help of such grooves themselves, as they creaked the lower beam. The upper fastening to the stіyk vykonuєtsya with two flowers, as if they were to be taken into the material no less than 10 cm lower. Read the report about it at the article ““. It is also recommended that you familiarize yourself with the most important buildings.

Insulated walls

The old walls of the booth are sheathed with an imitation of a beam, with a wooden clapboard, plastic, as a result, the master of the booth. Insulation is better than zrobiti for additional mineral wool. It is environmentally friendly, durable and does not burn, so that the carcassers can be robbed even more with vigor and demands.


Scheme of proper insulation of frame walls

The material must be pressed into all the gaps between the beams, to clean up the empty ones. Save the tree from vіd vologi dopomog gidrota vіtrozakhisna membrane, yak krіpitsya over the top of the insulation on the racks, and then the lath sheathing for the ventilated facade is less stuffed, which will be attached to the ovnishnіshnіm cladding. Zeredini for sheathing walls pіdіyde OSB or slabs of gypsum fiber, which are mounted on top of the vapor barrier.

Sporudzhuemo stele

The stele is fastened to the beams of the ceiling, yakі fixed with flowers or steel brackets on the beams of the upper strapping. There, where interstitial partitions are installed, it is necessary to install supporting beams, and a wooden stele shield is nailed to the places where they are installed.


Dah

The first step is to proceed to the work, determine the degree of sickness, the number of slopes, the type of roof lining, the design of the roof system.


Yes, with a foldable form, it looks pleasant, but folded in the implementation, it is not cheap. Most often they speak about what they allow, otherwise the mountainous place. Here it is necessary to install only one horse, rozzholobkіv and zovsіm vіdsutnі, which includes the collection of fall and protіkannya. So that you don’t get caught up in the snow, plan to get more than 28 º, but not more than 50 º, otherwise the wind will increase.

Pereraz krokv vyznajetsya vіdpovіdno up to the size of the insulating material, which is placed between them. It is best to take a doshka, with a caliber of 150x50mm and a length of 6 m. to the help of the crossbar, and we take it like a crock.


Yak Mauerlat here is the upper strapping. Behind the crumbling, they create a crochet for the entire cover, not forgetting about the crochet of 600 mm. Roques on the conic are installed on the pediment and the installation of other elements is continued along them. Vіd type pokrіvelnogo material to fall, what will be reshetuvannya.

Covering material

Pokrokov's instructions will end at the stage of installation of the pokrivelny facing. You can choose either. With the use of these materials, it is easy to manufacture, the stench is available at a price and can look decent. In case of oblitsyuvalnyh robots, it will be necessary to install a drainage pipe and a drainage system, as a reminder for the introduction of falling out of the inter-lots.

Now you show the whole process of the life of a frame booth with your own hands , so that the construction was warm and warm. If you do not ignore the rules of everyday life and the technology of folding, you will become a happy master of a wet booth, about which you can only dream.